Best Time of the Year for Concrete Installation

Well, if you are planning on repairs that involve concrete, you might have to wait for the right time. Concrete slabs and floors have to take a while to set and achieve maximum strength. The results will depend on the type of concrete, the external conditions and the size of the slabs. Together with these factors, the time available for the setting of concrete varies. Therefore, before you start your construction take time to understand the most suitable time to lay concrete.

Temperature Considerations

With a reinforced concrete structure, you can be sure of stability and maximum strength. However, over time, the slabs can deteriorate and call for expensive repairs. When you install concrete during rainy months, the water comes into contact with steel bars leading to rust. Eventually, the structure forms cracks. One intervention that involves incorporating living agents in concrete mixes prevents deterioration by bacteria and other living organisms.

Some interventions during extreme weather can help when installing concrete. This includes using hot water in the mix during extreme cold seasons and adding fast-drying agents to enhance cure as soon as possible. These interventions are practiced by high-profile contractors who have tested the suitability of such measures. Installing concrete during winter compromises the strength by forming cracks during the setting process.

Equally, during hot weather, the concrete may not set evenly. The top tends to cure faster than the bottom layers which affect stability and strength. If concrete has to be laid during such conditions, you can use ice-cold water in the mix before installation. More to this, the contractor has to introduce a sprinkler to ensure the concrete surface remains wet throughout the curing process.

Favorable Months

So, which are the best months for concrete work? April and May tend to be favorable for most construction work. The temperatures are above freezing points and not as high as to cause substantial harm. However, with high rainfall in May, your project may end up a mess. Too much moisture on a newly-laid structure can result in reduced strength.

September, with mild temperatures and minimal showers, is the perfect time to lay your concrete structures. The conditions are neither too extreme nor too low for the construction work. However, at times the circumstances may change and go beyond the usual. At that stage, you ought to consult your contractor and implement mitigation measures to protect your project and prevent possible damage.

If you are scheduling a construction, it’s advisable to do so around September when temperatures are quite favorable. However, if you have to complete your project during the other months, ensure you implement preventive measures to enhance your building’s strength. Additionally, consider seeking professional assistance to practice proper mixing, installing and setting of concrete.